Filter sediment from water during all your dewatering operations with our premium dewatering bags. Made from needle-punched non-woven geotextile fabric with durable double-sewn seams, these bags ensure reliability and strength. Available in two sizes:
- 1.28m x 1.91m (4′ x 6′)
- 1.5m x 3m (5′ x 10′)
Category: Sediment Control
RELATED PRODUCTS
Erosion Control Blanket
Erosion Control Blankets are designed to stabilize banks, establish vegetation, and control erosion along banks, hills, rivers, and streams. These blankets are fully biodegradable and come with photodegradable netting. Each roll covers an area of 100 yd² (83.6 m²). Straw blankets have a lifespan of up to 12 months, while those made from coconut fiber or a straw/coconut blend last between 24 and 36 months. Biodegradable and metal staples are available separately.
- Double Net Straw
- Double Net Straw / Coconut
- Double Net Coconut
Silt Fence
Silt Fence is used for perimeter control, positioned below areas where sheet flows discharge from the job site or below disturbed areas where runoff may occur.
We offer rolls of fabric as well as fabric with attached wood stakes.
We provide Contractor Grade, Wire-backed, and MTO options in both heavy and light duty.
Silt Sock
The Silt Sock is a polypropylene mesh sock filled with wood chips.
This product is low maintenance, reusable, and environmentally friendly, designed for erosion control on job sites.
In many areas, filled socks can be used as an alternative to silt fences. The lower profile of the sock makes your project more aesthetically pleasing and easier to access.
The Silt Sock is packaged on a standard 4x4 pallet.
- 8" (200mm) | 60 m
- 12" (300mm) | 35 m
- 18" (450mm) | 15 m
- More Size Available, please contact us.
Storm Drain Inlet Filter
Serves as an excellent sediment control solution for storm drain inlets during the construction phase. Made from high-quality woven coconut husk fibers, this natural product is easy to install within minutes and can hold a large quantity of sediment. It is an environmental best management practice for ensuring compliance during the construction phase.